News in English 18.07.2012Imprimir

Museum

Miami breaks new ground on stunning new science museum project

Visual Acuity enters new phase of technology consultancy for America’s new ‘building as exhibit’

The ground-breaking ceremony for the new building at the Patricia and Philip Frost Museum of Science has now taken place, giving independent technology consultancy Visual Acuity the chance to start work on the next phase of a project that looks set to capture the imagination of the architectural, technology and audiovisual communities worldwide. Formerly the Miami Science Museum, the new museum is on track to open in 2015.

Miami breaks new ground on stunning new science museum project

At InfoComm 2012 in Las Vegas the technology design team met with the major technology suppliers and integrators to brief them on the project and to explain the groundbreaking link between the building, its exhibits and its users which is to be enabled by network based technologies.

A partly open-air structure designed by Grimshaw Architects, the new building will be home toscience galleries, a learning center, a planetarium, energy playground and a‘living core’ aquarium and wildlife centre containing a microcosm of South Florida’s animal, fish and plant species. The core design concept is the ‘building as exhibit’, and Grimshaw’s design is a ‘living building’ – one that changes physically and visibly in response to the environment, events and the mood of Miami.

The construction project is supported by Miami Dade’s Building Better Communities Bond Program, The 4 acre site in a waterfront park is provided by  the City of Miami. The private fundraising campaign has resulted in a $35 million commitment from Philip and Patricia Frost to name the building. Funding commitments have also been received from John S. and James L. Knight Foundation, the U.S. Department of Energy and private donors.

Visual Acuity has been working on the design and development of the building’s core technologies for over a year, drawing up specifications for IT networks, WiFi, distributed antennae, ticketing, digital signage and more.

“Working together with Grimshaw, our aim is for the building to be fully intelligent, with networked systems that can be operated remotely from anywhere in the building,” explains Blair Parkin, MD of Visual Acuity. “As well as its symbolic significance, the ground-breaking ceremony is important to us because it signals the next phase of the project – the preparation of technical systems and opening discussions with the technology supply community.”

Más sobre...

Also working with Visual Acuity on the project is Oakland, California based Teecom, a consultancy that specializes in the creation of built environments that are socially and technologically compelling for the people that work in them and use them. And as well as a strong emphasis on cutting-edge technology, the building will also have impeccable environmental credentials, with the goal of attaining a LEED platinum rating when the project is complete.

“High-performance ventilation and air-conditioning systems are being designed to provide comfort while using the minimum amount of energy,” says Parkin, “and the building will be crowned by a vegetated roof.”

A newly constructed wetland is being developed adjacent to the building to ensure efficient control of storm-water runoff and to enhance the biodiversity of the site overall.

 

Búsqueda de Noticias

Por favor, rellena el campo de búsqueda.

Ahora en portada...